Mitsubishi Electric PMFY-P.NBMU-E Manual de instalación

Busca en linea o descarga Manual de instalación para Acondicionadores de aire del sistema de división Mitsubishi Electric PMFY-P.NBMU-E. Mitsubishi Electric PMFY-P.NBMU-E Installation manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 12
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
INSTALLATION MANUAL
For safe and correct use, please read this installation manual thoroughly before installing the air-conditioner unit.
Air-Conditioners For Building Application
INDOOR UNIT
PMFY-P·NBMU-E
Vista de pagina 0
1 2 3 4 5 6 ... 11 12

Indice de contenidos

Pagina 1 - PMFY-P·NBMU-E

INSTALLATION MANUALFor safe and correct use, please read this installation manual thoroughly before installing the air-conditioner unit.Air-Conditione

Pagina 2 - 1. Safety precautions

10• Adjust the front panel so that it fits properly in the angle between the ceiling and thewall, and install the securing bolts 2 (supplied with this

Pagina 4

Please be sure to put the contact address/telephone number onthis manual before handing it to the customer.This product is designed and intended for u

Pagina 5 - 90° ±0.5°

2Contents1. Safety precautions ... 22. Installing the indoor unit ...

Pagina 6 - 4. Drainage piping work

3A9-3/8 (247)2-1/16(53)11/16 (17.5)11/16 (17.5)13/16 (20)13/16 (20)1-1/8 (28)1-1/8 (28)1-25/32 (45)13/16 (20)1-3/4 (45)3/4 (20)13-1/2 (340) 317 (430)

Pagina 7 - 5. Electrical work

4DEFG13-1/2(340)31-7/8 (811)Check the pitch of the suspension bolt. (13-1/2 in. × 32 in. (340 mm × 811 mm)) (Fig.2-6)1. Thread washers 1 2 (supplied)

Pagina 8

5A9-13/16 (250) 11-3/8 (288.5)4-4/16(108)2. Installing the indoor unit2.5. Fresh air intake hole (Fig. 2-8)At the time of installation, use the hole (

Pagina 9 - 6. Test run

64. Drainage piping workBMLKDEDHIGDFFF12HACDGFEBI4.1. Drainage piping work• Use O.D. ø26 PVC TUBE for drain piping and provide 1/100 or more downwards

Pagina 10 - 7. Installing the grille

75. Electrical workFig. 5-15.1. Electric wiring (Fig. 5-1)* Make sure all electrical wiring is complete before installing the cover panel.1. Secure th

Pagina 11

85. Electrical work5.4. Sensing room temperature with the built-in sensorin a remote controllerIf you want to sense room temperature with the built-in

Pagina 12 - BG79U635H01

95. Electrical work1AFig. 5-7AB TB6B2) Connecting procedures (Fig. 5-7)1 Connect the remote controller cord to the terminal block.A To TB5 on the indo

Comentarios a estos manuales

Sin comentarios