FOR INSTALLER
Air-Conditioners
PUHZ-RPHA5
PUHZ-RPKA2
INSTALLATION MANUAL
For safe and correct use, read this manual and the indoor unit installation manual thoroughly before installing
the air-conditioner unit.
English
Vista de pagina 0
1 2 3 4 5 6 ... 15 16

Indice de contenidos

Pagina 1 - PUHZ-RP•KA2

FOR INSTALLERAir-ConditionersPUHZ-RP•HA5PUHZ-RP•KA2INSTALLATION MANUALFor safe and correct use, read this manual and the indoor unit installation manu

Pagina 2 - Contents

S3S3S2S1S2S1L N106.ElectricalworkFig. 6-3* In case of PEA-170, 200PUHZ-170, 200PEA-170, 200 Power supply Earth leakage breaker Circuit breaker

Pagina 3 - 2. Installation location

S1S2S3S1S2S3116.2.FieldelectricalwiringOutdoor unit modelRP71V RP100,125V RP140, 170V RP100, 125, 140Y RP170, 200YOutdoor unit power supply ~/N (si

Pagina 4

127.Testrun7.1.Beforetestrun►Aftercompletinginstallationand the wiringandpipingoftheindoor andoutdoor units, check for refrigerant

Pagina 5 - RP100-200

13Caution:Make sureto perform the“7. Testrun” andconrmthe unitworkswithoutanyproblems,beforestartingthefollowingsettings.►Howto

Pagina 6 - R0.4~R0.8

14* Set the refrigerant address using the DIP switch of the outdoor unit.1 Wiring from the Remote ControlThis wire is connected to TB5 (terminal boa

Pagina 7

Unit : mmFig. 2-7Fig. 2-11Fig. 2-12Fig. 2-13Fig. 2-14 Fig. 2-15Fig. 2-16 Fig. 2-17 Fig. 2-18Fig. 2-10Fig. 2-9Fig. 2-8Fig. 2-6150(100)300(200)1000Max.

Pagina 8

HEAD OFFICE: TOKYO BLDG., 2-7-3, MARUNOUCHI, CHIYODA-KU, TOKYO 100-8310, JAPANRG79U640L02 Printed in JapanThis product is designed and intended for us

Pagina 9 - 5. Drainage piping work

2Contents1. Safety precautions►Before installing the unit, make sure you read all the “Safety precautions”. ►Pleasereporttoortakeconsentbyt

Pagina 10 - 6.Electricalwork

950330+30943 (1350)17560037031. Safety precautions1.3. Before electric work Caution:• Besure to installcircuitbreakers.Ifnotinstalled,elec

Pagina 11

42. Installation location 2.4.Ventilationandservicespace2.4.1.WindylocationinstallationWhen installing the outdoor unit on a rooftop or o

Pagina 12 - 7.Testrun

5Fig. 3-13. Installing the outdoor unit• Be sure to install the unit in a sturdy, level surface to prevent rattling noises during operation. (Fi

Pagina 13 - 9. Special Functions

90°±0.5°øAR0.4~R0.845°± 2 °90°±0.5°øAR0.4~R0.845°± 2 °64.2.Connectingpipes(Fig.4-1)• When commercially available copper pipes are used, wrap liq

Pagina 14

74.InstallingtherefrigerantpipingAA Stop valve <Liquid side>B Stop valve <Gas side>C Service portD Open/Close sectionE Local pipe

Pagina 15 - 500 (300)

84.Installingtherefrigerantpiping Maximum pipe length (RP170·RP200)Note : Be sure to use hard (tempered) one for pipe over :22.2.75m[30m]<Marks

Pagina 16 - RG79U640L02 Printed in Japan

9Perform the airtight test, vacuum air purging, additional refrigerant charging (if necessary), and gas leak check.4.7.Precautionswhenreusingexis