INSTALLATION MANUALFOR INSTALLERCONTENTS1. BEFORE INSTALLATION ...22. OUTDO
HEAD OFFICE: TOKYO BLDG., 2-7-3, MARUNOUCHI, CHIYODA-KU, TOKYO 100-8310, JAPANJG79A073H02
21. BEFORE INSTALLATION1-1. THE FOLLOWING SHOULD ALWAYS BE OBSERVED FOR SAFETY• Be sure to read “THE FOLLOWING SHOULD ALWAYS BE OBSERVED FOR SAFETY” b
32.Front (blowing) side openAs long as space like the oneVKRZQLQWKH¿JXUHFDQEHmaintained, it does not mat-ter if there are obstacles inthree dire
41-6. INSTALLATION DIAGRAM8QLWVVKRXOGEHLQVWDOOHGE\OLFHQVHGFRQWUDFWRUDFFRUGLQJWRORFDOFRGHUHTXLUHPHQWV$IWHUWKHOHDNWHVWDSSO\LQVXODW-LQJ
52. OUTDOOR UNIT INSTALLATION2-1. INSTALLING THE UNIT %HVXUHWR¿[WKHXQLW¶VOHJVZLWKEROWVZKHQLQVWDOOLQJLW %HVXUHWRLQVWDOOWKHXQLW¿UP
6Remark:* A disconnect switch should be required. Check the local code.** Use a ring tongue terminal in order to connect a ground wire to terminal.
7Fig. 1 Fig. 2Fig. 3 Fig. 4Fig. 5 Fig. 63. FLARING WORK AND PIPE CONNECTION3-1. FLARING WORKPipe diameter>PPLQFK@NutPP$>PPLQFK@ Tighten
84-2. GAS CHARGEPerform gas charge to unit. &RQQHFWJDVF\OLQGHUWRWKHVHUYLFHSRUWRIVWRSYDOYH 3HUIRUP DLU SXUJH RI WKH SLSH RU K
9Procedure3UHVVWKHSLSLQJZLULQJFRUUHFWLRQVZLWFK6:PLQXWHRUPRUHDIWHUWXUQLQJRQWKHSRZHUVXSSO\• Correction completes in 10 to 15 minu
Comentarios a estos manuales